Tunisian telco Tunisie Telecom has signed a strategic partnership agreement with the Medusa subsea cable system. The 8,700km Medusa cable will have 17 landing points across Algeria, Cyprus, Egypt, France, Greece, Italy, Libya, Morocco, Portugal, Spain, and Tunisia when launched in early 2026. com ('the Site') and are legally binding on you. The Site is owned and operated by Developing Telecoms Limited ('the Owner', 'we', 'us', 'our'). Please read the Terms before. We set up an experiment on 12 April 2026 — four of our GeoCables probes spread across Belarus, Kazakhstan, Georgia and Israel, four real Tunisian target IPs sitting on four different operators, thirty-two measurements between them, all within a single hour. As a result, the deal will see the development of a dedicated fibre-optic link between Bizerte, Tunisia and Marseille, France, with a capacity of 20 Tbps.
[PDF Version]